Jiyang Line
| Jiyang Line | |
|---|---|
| Jiyang Line | |
| Overview | |
| Other name | Jiyang Tram |
| Native name | 济阳线 |
| Status | Operational |
| Owner | Jinan Rail Transit Group |
| Locale | Jinan, Shandong, China |
| Termini |
|
| Stations | 16 (11 in operation) |
| Service | |
| Type | Tram / Light rail |
| System | Jinan Metro |
| Operator(s) | Jinan Metro |
| Depot(s) | Jiyang North Depot (济阳北车辆段) |
| Rolling stock | CRRC Qingdao Sifang 3-car Tram units |
| History | |
| Opened | 30 December 2025 |
| Technical | |
| Line length | 36.1 km (22.4 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 750 V DC Overhead catenary |
| Operating speed | 70 km/h (43 mph) |
The Jiyang Line (Chinese: 济阳线), also known as Jiyang Tram is the eighth line and also the first modern tram line of Jinan Metro system and also the first tram in operation in Shandong province. It's open for passenger service on 30 December 2025 at 10:00 am.[1] The total length of this line is 36.1 km. The line will also be the first to cross the Yellow River in Shandong province. The project will cost a total of 6.65 billion yuan ($1.01 billion), and the average cost per kilometer will be 198 million yuan, less than the cost of a metro line. [2]
Stations
OSI: Out of system interchange.
| Station name | Transfer | Structure Type | Distance km |
Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Jinandong Railway Station | 济南东站 | 3 6 (Both OSI) |
Underground | 0.00 | 0.00 | Licheng |
| Cuizhai | 崔寨 | Underground | 11.50 | 11.50 | Jiyang | |
| Huanghe Huizhan Zhongxin | 黄河会展中心 | Underground | 3.20 | 14.70 | ||
| Yingcai Xueyuan Beixiaoqu | 英才学院北校区 | Underground | 4.50 | 19.20 | ||
| Qingning | 清宁 | Underground | 2.80 | 22.00 | ||
| Huaerzhuang Beijie | 花二庄北街 | Elevated | 2.50 | 24.50 | ||
| Huihe | 回河 | Elevated | 3.00 | 27.50 | ||
| Xinyuan Xueyuan | 新元学校 | Underground | 2.20 | 29.70 | ||
| Jibei Xiaoxue | 济北小学 | Underground | 2.10 | 31.80 | ||
| Jiyang Shimin Zhongxin | 济阳市民中心 | Underground | 1.80 | 33.60 | ||
| Jiyang North | 济阳北 | At-grade | 2.50 | 36.10 | ||
Fares
A one-way fare is 2 CNY for all destination of this line. [3]
References
- ^ "济南轨道交通济阳线正式开通运营". 30 December 2025.
- ^ "Jinan's first tram line to begin operating in May 2022". 30 November 2020.
- ^ "12月30日10时,济南轨道交通济阳线开通运营". 31 December 2025.